Skip to content

Freeze and put materials down on the signal

K-2, 3-5LatencyTemplateReview and individualize before use. How templates are made
When to use this goal

For primary students who keep building, drawing, or talking long after the class stop signal, missing the next direction. Present levels decide fit. The class signal (a chime, a call-and-response) is the cue.

Baseline
Time 10 or more signals from the cue to materials down, noting the activity. Write an operational definition first (what counts as the impulsive response and what counts as using the strategy), and teach and practice the strategy before measuring it.
Tips
Give a short warning before the stop when possible. Timing stops when materials are down. Let the student return to the activity after the direction when the plan allows.
Limits
Preferred activities are harder; report them separately. Not a safety stop.

Original IEP Atlas template based on general measurement principles; not copied from any goal bank. ID ef-ic-008.

Sign in to add this goal to a student.

Student

How the goal refers to the student

Skill

What the student will do

Something an adult can see, count or time.

Condition

When or under what conditions

Support

Support allowed

Criterion

Time from a cue (such as a direction) to the start of the response.

Sample numbers. Replace them with the student's data.

Criterion wording

Data collection

The time between a cue (such as a direction) and the start of the response is timed.

How often data are collected
Mastery rule

How many measurements must meet the criterion.

Timeframe

Timeframe

Goal

By the annual IEP review date, when the class stop signal is given during hands-on work, the student will stop the activity and put their materials down on the table independently within 5 seconds, on 4 of 5 consecutive school days, as measured by latency recording collected at three signals a day, four days a week.

Baseline: 20 seconds.

  • Condition
  • Observable behavior
  • Criterion
  • Measurement method

ObjectivesCopy by fieldData sheet

Measurability check10 of 11 met · 1 to review
  • Review: Unit fits the behavior. Latency measures how quickly a response starts. The behavior should describe starting or responding.

  • Met: Observable behavior. Stated as an action.

  • Met: Condition. Stated.

  • Met: Explicit criterion. Number and unit stated.

  • Met: Mastery rule and schedule. Both stated.

  • Met: Method produces the metric. Latency recording gives latency data.

  • Met: Review timeframe. Stated.

  • Met: Baseline and target compatible. Same unit, change in the right direction.

  • Met: Aligned with area of need. Still about Impulse Control & Inhibition.

  • Met: Level of support. Defined.

  • Met: Blanks filled in. Nothing left to fill in.

Checks structure and wording only. Whether the goal fits the student is the team's call.

Short-term objectives (optional)

When are objectives required?

Required for students on alternate assessments (34 CFR §300.320(a)(2)(ii)); some states require them for everyone.

Build objectives by

Paste into your IEP system

Most district systems have a separate box for each part of a goal. Copy them one at a time, or all at once as labeled text.

Area of need
Executive Function - Impulse Control & Inhibition
Baseline
20 seconds.
Annual goal317 characters
By the annual IEP review date, when the class stop signal is given during hands-on work, the student will stop the activity and put their materials down on the table independently within 5 seconds, on 4 of 5 consecutive school days, as measured by latency recording collected at three signals a day, four days a week.
Timeframe
By the annual IEP review date
Condition
When the class stop signal is given during hands-on work
Behavior
The student will stop the activity and put their materials down on the table independently
Criteria
Within 5 seconds, on 4 of 5 consecutive school days
Evaluation method
Latency recording
Schedule
At three signals a day, four days a week

Copied as plain text, with straight quotes and plain dashes.

Matching data sheet

Latency tracker. Records the cue time and the response time.

The CSV opens in Excel or Google Sheets, with formulas. Sheets print blank; no student data is stored.