Skip to content

Pick up a photo task strip and begin

6-8, 9-12LatencyTemplateReview and individualize before use. How templates are made
When to use this goal

For older students with significant support needs doing school jobs (recycling route, copy room, mail delivery, restocking) who wait for an adult to say go. Materials are adult ones: photos of the real job, not cartoons. Present levels, not grade, decide the job and the support level.

Baseline
Time from arrival at the job station (or the alarm) to the first pictured step for five job days. Record any prompts given. If the student does not know the first step, teach the job first with a task analysis.
Tips
School jobs are a bridge to work-based learning; keep the materials and words adult (route, shift, supervisor). The photo strip can live on a lanyard or phone. Record latency on the job log the student uses, so data are part of the job.
Limits
Measures starting only; the full job is a task-analysis goal. Jobs done in busy hallways have more distractions; compare like with like.

Original IEP Atlas template based on general measurement principles; not copied from any goal bank. ID ef-ti-034.

Sign in to add this goal to a student.

Student

How the goal refers to the student

Skill

What the student will do

Something an adult can see, count or time.

Condition

When or under what conditions

Support

Support allowed

Criterion

Time from a cue (such as a direction) to the start of the response.

Sample numbers. Replace them with the student's data.

Criterion wording

Data collection

The time between a cue (such as a direction) and the start of the response is timed.

How often data are collected
Mastery rule

How many measurements must meet the criterion.

Timeframe

Timeframe

Goal

By the annual IEP review date, when the student's daily schedule shows a school job and the photo task strip is at the job station, the student will take the photo task strip and begin the first pictured step of the job independently within 45 seconds, on 4 of 5 consecutive job days, as measured by latency recording collected daily.

Baseline: 180 seconds.

  • Condition
  • Observable behavior
  • Criterion
  • Measurement method

ObjectivesCopy by fieldData sheet

Measurability check11 of 11 met
  • Met: Observable behavior. Stated as an action.

  • Met: Condition. Stated.

  • Met: Unit fits the behavior. Latency fits this behavior.

  • Met: Explicit criterion. Number and unit stated.

  • Met: Mastery rule and schedule. Both stated.

  • Met: Method produces the metric. Latency recording gives latency data.

  • Met: Review timeframe. Stated.

  • Met: Baseline and target compatible. Same unit, change in the right direction.

  • Met: Aligned with area of need. Still about Task Initiation.

  • Met: Level of support. Defined.

  • Met: Blanks filled in. Nothing left to fill in.

Checks structure and wording only. Whether the goal fits the student is the team's call.

Short-term objectives (optional)

When are objectives required?

Required for students on alternate assessments (34 CFR §300.320(a)(2)(ii)); some states require them for everyone.

Build objectives by

Paste into your IEP system

Most district systems have a separate box for each part of a goal. Copy them one at a time, or all at once as labeled text.

Area of need
Executive Function - Task Initiation
Baseline
180 seconds.
Annual goal334 characters
By the annual IEP review date, when the student's daily schedule shows a school job and the photo task strip is at the job station, the student will take the photo task strip and begin the first pictured step of the job independently within 45 seconds, on 4 of 5 consecutive job days, as measured by latency recording collected daily.
Timeframe
By the annual IEP review date
Condition
When the student's daily schedule shows a school job and the photo task strip is at the job station
Behavior
The student will take the photo task strip and begin the first pictured step of the job independently
Criteria
Within 45 seconds, on 4 of 5 consecutive job days
Evaluation method
Latency recording
Schedule
Daily

Copied as plain text, with straight quotes and plain dashes.

Matching data sheet

Latency tracker. Records the cue time and the response time.

The CSV opens in Excel or Google Sheets, with formulas. Sheets print blank; no student data is stored.