Skip to content

Follow the finished routine after completing independent work

K-2, 3-5Task-analysis stepsTemplateReview and individualize before use. How templates are made
When to use this goal

For students who finish early and then wander, call out, or sit idle while waiting for the teacher. The classroom needs a posted when-finished list; present levels and observation of what the student does after finishing decide fit.

Baseline
Observe the routine on at least 3 typical days before setting a target. Mark each step as independent (no adult prompt of any kind), completed with support (note the prompt type), or not completed. Count only independent steps toward the baseline, and note which steps are missed most often; those may need direct teaching rather than more practice. Opportunities occur only when the student finishes early; a short task on purpose during baseline creates them.
Tips
Keep the when-finished list to three or four quiet, self-contained choices. If the student rushes work to get to the list, add the checking step as the first requirement and review work quality.
Limits
Students who rarely finish early give little data. The checklist does not score the quality of the finished work.

Original IEP Atlas template based on general measurement principles; not copied from any goal bank. ID fn-si-017.

Sign in to add this goal to a student.

Student

How the goal refers to the student

Skill

What the student will do

Something an adult can see, count or time.

Condition

When or under what conditions

Support

Support allowed

Criterion

Number of routine steps performed independently.

Sample numbers. Replace them with the student's data.

Task-analysis steps

Write each step so an observer can mark it done or not done.

Criterion wording

Data collection

A routine is broken into ordered steps; each step is recorded as independent, supported, or not completed.

How often data are collected
Mastery rule

How many measurements must meet the criterion.

Timeframe

Timeframe

Goal

By the annual IEP review date, when independent work is finished before the class period ends and a when-finished list is posted, the student will complete the finished routine and begin a listed activity, performing at least 4 of 5 steps independently, on 4 of 5 consecutive early-finish opportunities, as measured by a task-analysis checklist collected daily when the student finishes early, summarized weekly.

Baseline: 1 of 5 steps independently.

  • Condition
  • Observable behavior
  • Criterion
  • Measurement method

ObjectivesCopy by fieldData sheet

Measurability check11 of 11 met
  • Met: Observable behavior. Stated as an action.

  • Met: Condition. Stated.

  • Met: Unit fits the behavior. Task-analysis steps fits this behavior.

  • Met: Explicit criterion. Number and unit stated.

  • Met: Mastery rule and schedule. Both stated.

  • Met: Method produces the metric. Task-analysis checklist gives task-analysis steps data.

  • Met: Review timeframe. Stated.

  • Met: Baseline and target compatible. Same unit, change in the right direction.

  • Met: Aligned with area of need. Still about School-Related Independence.

  • Met: Level of support. Defined.

  • Met: Blanks filled in. Nothing left to fill in.

Checks structure and wording only. Whether the goal fits the student is the team's call.

Short-term objectives (optional)

When are objectives required?

Required for students on alternate assessments (34 CFR §300.320(a)(2)(ii)); some states require them for everyone.

Build objectives by

Paste into your IEP system

Most district systems have a separate box for each part of a goal. Copy them one at a time, or all at once as labeled text.

Area of need
Functional & Independence Skills - School-Related Independence
Baseline
1 of 5 steps independently.
Annual goal412 characters
By the annual IEP review date, when independent work is finished before the class period ends and a when-finished list is posted, the student will complete the finished routine and begin a listed activity, performing at least 4 of 5 steps independently, on 4 of 5 consecutive early-finish opportunities, as measured by a task-analysis checklist collected daily when the student finishes early, summarized weekly.
Timeframe
By the annual IEP review date
Condition
When independent work is finished before the class period ends and a when-finished list is posted
Behavior
The student will complete the finished routine and begin a listed activity
Criteria
Performing at least 4 of 5 steps independently, on 4 of 5 consecutive early-finish opportunities
Evaluation method
A task-analysis checklist
Schedule
Daily when the student finishes early, summarized weekly

Copied as plain text, with straight quotes and plain dashes.

Matching data sheet

Task-analysis checklist. Marks each step in each session.

The CSV opens in Excel or Google Sheets, with formulas. Sheets print blank; no student data is stored.