Skip to content

Start work promptly after clocking in

9-12LatencyTemplateReview and individualize before use. How templates are made
When to use this goal

For students who clock in on time but then chat, wander or wait several minutes before working. Present levels in task initiation and the site's routine decide whether a first-task card is used.

Baseline
Time from clock-in (or break end) to the first work action on 5 shifts. Note what fills the gap; a coworker greeting is fine and short.
Tips
Greeting coworkers (fn-voc-012) is part of starting a shift; agree on a short window for it. Pair with fn-voc-002 (clocking in).
Limits
Measures the start, not continued work. Sites with unclear first tasks make the goal unfair; post the task.

Original IEP Atlas template based on general measurement principles; not copied from any goal bank. ID fn-voc-065.

Sign in to add this goal to a student.

Student

How the goal refers to the student

Skill

What the student will do

Something an adult can see, count or time.

Condition

When or under what conditions

Support

Support allowed

Criterion

Time from a cue (such as a direction) to the start of the response.

Sample numbers. Replace them with the student's data.

Criterion wording

Data collection

The time between a cue (such as a direction) and the start of the response is timed.

How often data are collected
Mastery rule

How many measurements must meet the criterion.

Timeframe

Timeframe

Goal

By the annual IEP review date, after clocking in at the start of a work-based learning shift, with the first task posted, the student will start the first assigned task independently within 2 minutes, on 4 of 5 consecutive shifts, as measured by latency recording collected at each shift start and break return.

Baseline: 8 minutes.

  • Condition
  • Observable behavior
  • Criterion
  • Measurement method

ObjectivesCopy by fieldData sheet

Measurability check11 of 11 met
  • Met: Observable behavior. Stated as an action.

  • Met: Condition. Stated.

  • Met: Unit fits the behavior. Latency fits this behavior.

  • Met: Explicit criterion. Number and unit stated.

  • Met: Mastery rule and schedule. Both stated.

  • Met: Method produces the metric. Latency recording gives latency data.

  • Met: Review timeframe. Stated.

  • Met: Baseline and target compatible. Same unit, change in the right direction.

  • Met: Aligned with area of need. Still about Vocational & Work Readiness.

  • Met: Level of support. Defined.

  • Met: Blanks filled in. Nothing left to fill in.

Checks structure and wording only. Whether the goal fits the student is the team's call.

Short-term objectives (optional)

When are objectives required?

Required for students on alternate assessments (34 CFR §300.320(a)(2)(ii)); some states require them for everyone.

Build objectives by

Paste into your IEP system

Most district systems have a separate box for each part of a goal. Copy them one at a time, or all at once as labeled text.

Area of need
Transition & Postsecondary Skills - Vocational & Work Readiness
Baseline
8 minutes.
Annual goal311 characters
By the annual IEP review date, after clocking in at the start of a work-based learning shift, with the first task posted, the student will start the first assigned task independently within 2 minutes, on 4 of 5 consecutive shifts, as measured by latency recording collected at each shift start and break return.
Timeframe
By the annual IEP review date
Condition
After clocking in at the start of a work-based learning shift, with the first task posted
Behavior
The student will start the first assigned task independently
Criteria
Within 2 minutes, on 4 of 5 consecutive shifts
Evaluation method
Latency recording
Schedule
At each shift start and break return

Copied as plain text, with straight quotes and plain dashes.

Matching data sheet

Latency tracker. Records the cue time and the response time.

The CSV opens in Excel or Google Sheets, with formulas. Sheets print blank; no student data is stored.