Skip to content

Divide a group project into tasks and assign them

6-8, 9-12Task-analysis stepsTemplateReview and individualize before use. How templates are made
When to use this goal

For students whose present levels show group projects where no one knows who is doing what, and the student either does everything or nothing. Fits classes with group projects.

Baseline
Observe the first session of a group project and score this student's planning actions. Ask the teacher how past group projects went for the student (did everything, did nothing, did an unassigned part).
Tips
Score only this student's actions, not the group's. A step is independent when done without adult direction. Rotate the student's role so they practice both proposing and agreeing.
Limits
Group dynamics affect every step; a dominant peer removes opportunities. Group projects are infrequent, so data accumulate slowly.

Original IEP Atlas template based on general measurement principles; not copied from any goal bank. ID ef-pl-019.

Sign in to add this goal to a student.

Student

How the goal refers to the student

Skill

What the student will do

Something an adult can see, count or time.

Condition

When or under what conditions

Support

Support allowed

Criterion

Number of routine steps performed independently.

Sample numbers. Replace them with the student's data.

Task-analysis steps

Write each step so an observer can mark it done or not done.

Criterion wording

Data collection

A routine is broken into ordered steps; each step is recorded as independent, supported, or not completed.

How often data are collected
Mastery rule

How many measurements must meet the criterion.

Timeframe

Timeframe

Goal

By the annual IEP review date, at the start of a group project with a task sheet and group of three or four, the student will complete a group work plan with the group using a group planning sheet, performing at least 4 of 5 steps independently, on 3 consecutive group projects, as measured by a task-analysis checklist collected each group project.

Baseline: 1 of 5 steps independently.

  • Condition
  • Observable behavior
  • Criterion
  • Measurement method

ObjectivesCopy by fieldData sheet

Measurability check11 of 11 met
  • Met: Observable behavior. Stated as an action.

  • Met: Condition. Stated.

  • Met: Unit fits the behavior. Task-analysis steps fits this behavior.

  • Met: Explicit criterion. Number and unit stated.

  • Met: Mastery rule and schedule. Both stated.

  • Met: Method produces the metric. Task-analysis checklist gives task-analysis steps data.

  • Met: Review timeframe. Stated.

  • Met: Baseline and target compatible. Same unit, change in the right direction.

  • Met: Aligned with area of need. Still about Planning.

  • Met: Level of support. Defined.

  • Met: Blanks filled in. Nothing left to fill in.

Checks structure and wording only. Whether the goal fits the student is the team's call.

Short-term objectives (optional)

When are objectives required?

Required for students on alternate assessments (34 CFR §300.320(a)(2)(ii)); some states require them for everyone.

Build objectives by

Paste into your IEP system

Most district systems have a separate box for each part of a goal. Copy them one at a time, or all at once as labeled text.

Area of need
Executive Function - Planning
Baseline
1 of 5 steps independently.
Annual goal349 characters
By the annual IEP review date, at the start of a group project with a task sheet and group of three or four, the student will complete a group work plan with the group using a group planning sheet, performing at least 4 of 5 steps independently, on 3 consecutive group projects, as measured by a task-analysis checklist collected each group project.
Timeframe
By the annual IEP review date
Condition
At the start of a group project with a task sheet and group of three or four
Behavior
The student will complete a group work plan with the group using a group planning sheet
Criteria
Performing at least 4 of 5 steps independently, on 3 consecutive group projects
Evaluation method
A task-analysis checklist
Schedule
Each group project

Copied as plain text, with straight quotes and plain dashes.

Matching data sheet

Task-analysis checklist. Marks each step in each session.

The CSV opens in Excel or Google Sheets, with formulas. Sheets print blank; no student data is stored.