Skip to content

Map out a three-day project by day

3-5, K-2Task-analysis stepsTemplateReview and individualize before use. How templates are made
When to use this goal

For upper elementary students who try to finish a three-day project in one day or leave it to the last. The project should be a familiar type (a poster, a diorama, a short report). Present levels, not grade, decide whether the plan uses words or pictures.

Baseline
Watch a past project: did the student spread the work across the days? Then give a planning sheet without coaching and score the steps.
Tips
The planning sheet is the record. Moving unfinished work to the next day is a key skill; praise it. Keep the projects short and similar while the routine builds.
Limits
Projects vary in size; the routine matters more than the product. Does not score project quality.

Original IEP Atlas template based on general measurement principles; not copied from any goal bank. ID ef-pl-021.

Sign in to add this goal to a student.

Student

How the goal refers to the student

Skill

What the student will do

Something an adult can see, count or time.

Condition

When or under what conditions

Support

Support allowed

Criterion

Number of routine steps performed independently.

Sample numbers. Replace them with the student's data.

Task-analysis steps

Write each step so an observer can mark it done or not done.

Criterion wording

Data collection

A routine is broken into ordered steps; each step is recorded as independent, supported, or not completed.

How often data are collected
Mastery rule

How many measurements must meet the criterion.

Timeframe

Timeframe

Goal

By the annual IEP review date, when a three-day class project is assigned with a list of its parts, the student will complete the three-day project planning routine, performing at least 4 of 5 steps independently, on 3 consecutive class projects, as measured by a task-analysis checklist collected with each class project.

Baseline: 1 of 5 steps independently.

  • Condition
  • Observable behavior
  • Criterion
  • Measurement method

ObjectivesCopy by fieldData sheet

Measurability check11 of 11 met
  • Met: Observable behavior. Stated as an action.

  • Met: Condition. Stated.

  • Met: Unit fits the behavior. Task-analysis steps fits this behavior.

  • Met: Explicit criterion. Number and unit stated.

  • Met: Mastery rule and schedule. Both stated.

  • Met: Method produces the metric. Task-analysis checklist gives task-analysis steps data.

  • Met: Review timeframe. Stated.

  • Met: Baseline and target compatible. Same unit, change in the right direction.

  • Met: Aligned with area of need. Still about Planning.

  • Met: Level of support. Defined.

  • Met: Blanks filled in. Nothing left to fill in.

Checks structure and wording only. Whether the goal fits the student is the team's call.

Short-term objectives (optional)

When are objectives required?

Required for students on alternate assessments (34 CFR §300.320(a)(2)(ii)); some states require them for everyone.

Build objectives by

Paste into your IEP system

Most district systems have a separate box for each part of a goal. Copy them one at a time, or all at once as labeled text.

Area of need
Executive Function - Planning
Baseline
1 of 5 steps independently.
Annual goal322 characters
By the annual IEP review date, when a three-day class project is assigned with a list of its parts, the student will complete the three-day project planning routine, performing at least 4 of 5 steps independently, on 3 consecutive class projects, as measured by a task-analysis checklist collected with each class project.
Timeframe
By the annual IEP review date
Condition
When a three-day class project is assigned with a list of its parts
Behavior
The student will complete the three-day project planning routine
Criteria
Performing at least 4 of 5 steps independently, on 3 consecutive class projects
Evaluation method
A task-analysis checklist
Schedule
With each class project

Copied as plain text, with straight quotes and plain dashes.

Matching data sheet

Task-analysis checklist. Marks each step in each session.

The CSV opens in Excel or Google Sheets, with formulas. Sheets print blank; no student data is stored.